Progress · Munggu, Bali

Built from scratch

Fully funded to completion. Planned for February 2027.

Under construction

Follow every stage

We build the villas ourselves, from the ground up, and the build is fully funded through to completion. Buying off-plan means you can follow every stage. We share regular site photos and videos on Instagram, and we are happy to send the latest update on WhatsApp.

01

Done

Design and drawings

Architecture, interiors, materials and plumbing drawings for the villa design.

02

Done

Foundations and structure

Concrete frame and floors.

03

In progress

Walls, plastering and services

Blockwork walls, plastering, plumbing and electrical.

04

Next

Stone, marble and finishes

Facade stone, marble floors, terrazzo, timber and bathroom fittings.

05

Next

Pool, rooftop and landscaping

Pool and terrace, rooftop BBQ and dining, gardens.

06

February 2027

Completion and handover

Final checks and keys to owners.

On site

Real site photos

Real site photo: bedroom 2, November 2026Real site photo: bedroom 2 walls being plastered, November 2026Real site photo: ensuite 2 with the design pinned on the wall, November 2026Real site photo: ensuite 2 vanity being formed, November 2026Real site photo: ensuite 2 plumbing in place, November 2026Real site photo: villa 2 master bedroom, November 2026Real site photo: villa 2 master bedroom walls being plastered, November 2026Real site photo: villa 2 interior walls plastered, November 2026Real site photo: villa 2 master ensuite in progress, November 2026Real site photo: villa 2 master ensuite vanity being formed, November 2026Real site photo: the front of the villas with bamboo scaffolding, November 2026Real site photo: blockwork walls going up at the front, November 2026Real site photo: our team on site, November 2026Real site photo: all three villas from the rice fields, November 2026Real site photo: concrete frame up to roof level, November 2026Real site photo: ground and first floor in place, November 2026Real site photo: scaffolding on the side facade, November 2026Real site photo: the villas rising above the rice fieldsReal site photo: facade structureReal site photo: along the villa laneReal site photo: first-floor view to the rice fieldsReal site photo: structure and blockworkReal site photo: living level taking shapeReal site photo: pool area in progressReal site photo: blockwork wallsReal site photo: materials on siteReal site photo: plastering under wayReal site photo: scaffolding on the facadeReal site photo: interior walls